Coollegrean Wind Farm

Project phase: 
Nominal power (estimated): 
17.5 MW
Number of generating units: 

The Coollegrean Windfarm is located near Brosna, Co. Kerry and will consist of 7 2.5MW Nordex N90 wind turbines when operational. Project construction and turbine erection have been completed. The windfarm shall be is scheduled to be energised at the end of 2017 via the an on-site 38Kv substation, a 8.25 km underground cable to the Cordal Group 110Kv substation and then subsequently via 9.5km of underground grid connection to the ESB Ballynahulla 220kV substation.